Gareth Hurley

Senior Programme Development Manager, Network Rail (WRA)

Gareth Hurley has worked in the rail industry since 2008, and currently manages the scope of enhancement projects that are being developed and in delivery between London Paddington and Reading. This includes; Western Rail Link to Heathrow (WRLtH), integration with High Speed 2 and third party works along the Crossrail route. Previously, Gareth developed and delivered other projects within Network Rail, including freight gauge enhancements, Oxford remodelling (passenger capacity enhancements) and IEP train introduction in the Inner Thames Valley. Prior to Network Rail, Gareth’s early career was in the defence industry as a Design Engineer and Programme Manager.